Skip to main content
Tag

North York development

774–782 Marlee Avenue

774–782 Marlee Avenue: What’s Being Proposed

By Development Applications

Marlee Avenue continues to be one of those corridors where Toronto’s long-term planning goals are becoming increasingly visible on the ground. What was once a collection of low-rise homes and modest apartment buildings is steadily giving way to larger, transit-oriented residential projects — each one reshaping how density is accommodated outside the downtown core.

The proposal at 774–782 Marlee Avenue is a clear example of that evolution. After several rounds of review and refinement, the application has returned to the City as a taller (24 storey), more intensive development than earlier versions. Below, we break down where the site is, what’s being proposed today, how the project evolved through resubmission, and why it matters for the broader Marlee corridor.

Where Is the Site and What’s There Today?

The subject site spans 774, 776, 778, 780 and 782 Marlee Avenue, forming a consolidated mid-block assembly along one of North York’s increasingly active arterial corridors. Marlee Avenue has long functioned as a connective spine between Eglinton West and Lawrence Avenue West, and in recent years it has become a focal point for tall-building residential intensification tied closely to transit access.

Today, the properties are occupied by low-rise residential buildings that reflect an earlier era of development—uses that are increasingly difficult to sustain on a corridor designated for growth. The lot assembly allows for a more comprehensive redevelopment approach, replacing fragmented buildings with a single, coordinated project that can better address streetscape, access, landscaping, and servicing in one move.

774–782 Marlee Avenue
774–782 Marlee Avenue

From a planning perspective, this stretch of Marlee sits within an area where the City has been clear about its intent: modest density along major roads, close to transit, delivered in a built form that transitions appropriately to surrounding neighbourhoods.

What Is Being Proposed?

The application proposes a new tall-building residential building designed to intensify the site while maintaining a strong relationship with Marlee Avenue at grade. The development is residential in nature, with a built form that steps and massing intended to balance increased density with pedestrian comfort along the street.

774–782 Marlee Avenue
774–782 Marlee Avenue

At a high level, the proposal replaces the existing low-rise structures with a purpose-built residential building that incorporates:

  • A consistent streetwall along Marlee Avenue
  • Residential units above a carefully designed ground floor
  • Below-grade parking and servicing
  • Landscaped areas that address both public and private realms

The design reflects a familiar planning pattern along Toronto’s avenues: adding housing supply where infrastructure already exists, while improving the public edge through widened sidewalks, new trees, and clearer pedestrian routes.

What Changed in the Resubmission?

Like many applications along major corridors, this project went through a detailed review process that resulted in a comprehensive resubmission. The updated materials respond directly to City comments and refine the proposal across several key areas.

One of the most notable shifts relates to transportation and mobility. The resubmission strengthens the Transportation Demand Management strategy, including dedicated car-share spaces, enhanced bicycle facilities, real-time transit information in the lobby, and commitments around PRESTO card incentives for residents. These measures reflect the City’s broader push to reduce auto dependency for sites located close to rapid transit.

The landscape strategy was also meaningfully revised. Updated drawings increase soil volumes, reconfigure tree planting along the Marlee frontage, and improve long-term tree viability by consolidating planting areas and reducing hard surfaces within tree protection zones. In plain terms: fewer decorative planters, more real trees with enough soil to survive.

From a technical standpoint, the resubmission tightens up driveway geometry, curb cuts, sidewalk widths, and right-of-way conveyances to meet City standards. These changes don’t dramatically alter how the building looks, but they materially improve how the site functions day-to-day for pedestrians, cyclists, and vehicles.

774–782 Marlee Avenue
774–782 Marlee Avenue

Transportation, Transit, and the Marlee Corridor

One of the strongest planning arguments for this proposal is its location. Marlee Avenue is well-served by transit and sits within walking distance of higher-order routes, making it an ideal candidate for residential density without a proportional increase in car traffic.

The project leans into this reality. Parking is provided, but not over-supplied. Instead, the application emphasizes cycling infrastructure, transit incentives, and shared mobility options. This approach aligns with how newer developments across the city are being evaluated—less focus on how many cars a building can store, and more attention on how people actually move through the city.

For the corridor itself, this kind of development helps reinforce Marlee’s gradual shift from an auto-oriented street toward a more balanced, pedestrian-friendly environment.

How This Fits Into the Bigger Planning Picture

With the current resubmission, the proposal at 774–782 Marlee Avenue should now be understood as part of the City’s tall-building intensification strategy along major corridors, rather than a traditional mid-rise avenue project.

Marlee Avenue already contains a number of existing and approved apartment towers, particularly closer to Lawrence Avenue West. In that context, the shift toward greater height on this site reflects a planning logic the City has increasingly supported: concentrating density on wide arterial roads with transit access, while preserving lower-rise residential areas behind them.

Rather than representing a sudden or isolated jump in scale, the 24-storey proposal aligns with the evolving built form pattern along Marlee, where taller buildings are gradually becoming the dominant typology.

774–782 Marlee Avenue
774–782 Marlee Avenue

How This Evolved From Mid-Rise to Tall Building

Earlier iterations of the proposal explored a more conventional mid-rise form. Through the review process, however, City feedback and technical analysis pushed the project in a different direction.

Key factors behind that evolution include:

  • Lot depth and frontage: The assembled site is large enough to accommodate a taller building while still meeting tower separation, stepback, and sky view requirements.
  • Transit proximity: Strong access to TTC routes supported a more intensive use of the site with reduced parking reliance.
  • Unit efficiency: Moving vertically allowed the project to deliver a similar amount of floor area and housing supply with a smaller building footprint at grade.
  • Public realm improvements: A taller form enabled wider sidewalks, tree planting, and clearer pedestrian zones along Marlee Avenue.

From a planning standpoint, this kind of evolution is common. Projects often begin as mid-rise concepts and transition to tall-building forms once massing studies demonstrate that additional height can be accommodated responsibly.

Community Impacts to Watch

As the application moves forward, there are a few areas residents and observers will naturally keep an eye on.

Construction timing and logistics will matter, particularly given the site’s proximity to existing homes and community amenities. Tree protection and post-construction landscaping will also be important, as the success of the public realm improvements depends heavily on how well those elements are executed, not just how they’re drawn.

There’s also the question of how added residential density translates into daily street life—more foot traffic, more local spending, and a gradual shift in how Marlee Avenue is experienced at different times of day.

What Happens Next?

The application continues through the City’s review and approvals process, with further refinement expected at the site plan stage. From here, the focus typically shifts toward implementation details: final materials, construction sequencing, and conditions tied to servicing, landscaping, and public realm works.

While timelines can vary, projects at this stage are generally moving closer to realization rather than rethinking fundamentals.

Why This Matters for Buyers, Renters, and Neighbours

Planning applications like this don’t just shape skylines—they influence housing choice, rental supply, and neighbourhood evolution over time. For renters, purpose-built projects along transit corridors can introduce new options outside the downtown core. For buyers and homeowners nearby, understanding what’s coming helps frame long-term expectations around change.

If you’re curious how current and upcoming development along Marlee Avenue may affect buying or selling decisions, we’re always happy to talk through the bigger picture.

589–599 Lawrence Ave W

What’s Proposed for 589–599 Lawrence Avenue West

By Development Applications

Where Is 589–599 Lawrence Avenue West?

The properties at 589–599 Lawrence Avenue West sit along a well‑established stretch of Lawrence Avenue, west of Bathurst Street and East of Allen Rd. This portion of Lawrence functions as a key east–west corridor, lined with a mix of low‑rise residential homes (usually bungalows), small apartment properties, and nearby residential streets just beyond the main road.

From a planning perspective, Lawrence Avenue West has long been identified as a corridor capable of accommodating additional housing without disrupting surrounding low‑rise neighbourhoods. That context is important, because the proposal for this site is less about a single project and more about how the City intends corridors like Lawrence to evolve over time.

What’s Currently on the Site?

Today, the site is occupied by a collection of low‑rise buildings. These are single‑storey structures that reflect an older, auto‑oriented version of Lawrence Avenue and relatively low‑density given the size and location of the property.

Under current City policy, sites like this are often described as “underutilized,” not as a criticism of their use, but because they occupy valuable land near transit, services, and employment while housing very few people. This gap between land value and housing output is exactly what the City’s planning framework is trying to address.

What Is Being Proposed?

According to the City of Toronto’s Decision Report, the approved proposal for 589–599 Lawrence Avenue West is not a typical condo or mixed-use project, but a two-building, low-rise institutional and rental residential development.

Specifically, the project includes:

  • Two separate low-rise buildings on the assembled site
  • A 3-storey institutional building (13.1 metres, excluding mechanical penthouse) fronting the corner of Lawrence Avenue West and Englemount Avenue, which will ultimately house the Institute for Advanced Talmudic and Halachic Studies
  • This building will function as a religious study centre (Kollel), dedicated to advanced post‑graduate religious scholarship
  • A 4-storey rental residential building (13.6 metres, excluding mechanical penthouse) fronting Lawrence Avenue West, intended to serve as a residential component associated with the Institute, accommodating students and families connected to the program
  • 16 purpose-built rental units in total, the vast majority being family-sized

From a housing perspective, the unit mix is notable:

  • 15 three-bedroom units (94% of all units)
  • 1 one-bedroom unit

Importantly, this is a 100% rental project. There are no condominium units proposed, and the rental tenure is secured through City agreements.

What Is a Kollel? (In Plain English)

A Kollel is a post‑graduate religious study institution, typically focused on advanced Jewish learning. Unlike a traditional school campus, a Kollel is generally small‑scale, community‑oriented, and centred on full‑time study rather than large lectures or public events.

In practical terms, this means:

  • The building functions more like a quiet academic or research centre than a place of worship
  • Daily activity is largely daytime study, not event‑driven gatherings
  • The associated residential building allows students and their families to live on site, reducing commuting and traffic impacts

For planning purposes, the City treats a Kollel as a low‑intensity institutional use, which is why it can be accommodated within a Neighbourhoods designation when designed at an appropriate scale.

Rental Replacement — A Key Part of the Approval

One of the most consequential aspects of this application is the treatment of existing rental housing.

Currently, the site contains six rental dwelling units spread across older one-storey houses. Under Toronto’s Rental Housing Demolition and Conversion By-law, those units must be replaced — and in this case, the City required more than a simple one-for-one swap.

The approved proposal includes:

  • Six replacement rental units, all three-bedroom
  • Units sized at approximately 134 square metres, exceeding the size of the existing rental units
  • Affordable rent levels as defined by the City’s Official Plan
  • Rental tenure secured for at least 20 years, with affordability protected for a minimum of 10 years

Tenants in the replacement units will also have access to:

  • Ensuite laundry
  • Central air conditioning
  • Bicycle and visitor parking
  • All indoor and outdoor amenities within the development, at no extra cost

From a policy standpoint, this replacement package is a major reason the City supported the application.

Built Form, Height, and Neighbourhood Transition

While the project adds density, it does so within a very controlled envelope.

The total density is 1.46 times the lot area, which is modest by corridor standards. Building heights are capped at four storeys, consistent with the permissions under the Official Plan and Site and Area Specific Policy 559, which governs this stretch of Lawrence Avenue West.

A key design feature is the rear angular plane:

  • The buildings step back from the south property line
  • A 45-degree angular plane is maintained to limit shadowing and overlook
  • Rear setbacks increase on upper storeys, creating a softer transition to the single-detached homes on Fairholme Avenue

This is deliberate corridor planning — keeping height and mass on Lawrence Avenue while protecting the lower-rise neighbourhood behind it.

Traffic, Access, and Streetscape Changes

From a transportation standpoint, the City concluded that the project will have minimal impact on local traffic patterns.

Notable changes include:

  • A reduction in driveways along Lawrence Avenue West from six to one, improving pedestrian safety
  • Vehicle access shifted primarily to Englemount Avenue
  • 36 parking spaces provided (24 residential, 12 institutional), plus five pick-up/drop-off spaces
  • 23 on-site bicycle parking spaces, with an additional 10 publicly accessible bike parking spaces

City staff accepted the Transportation Impact Study, concluding that the surrounding road network can accommodate the additional trips without intersection upgrades.

Why This Proposal Was Supported by the City

In recommending approval, City Planning staff highlighted several factors:

  • The site is considered underutilized given its frontage on a major arterial road
  • The proposal conforms with the Provincial Policy Statement and the Growth Plan for the Greater Golden Horseshoe
  • Height, density, and massing align with Neighbourhoods policies and SASP 559
  • All existing rental housing is replaced with larger, family-sized units at protected rents

In short, the City viewed this project as a textbook example of gentle intensification — adding housing where policy encourages it, without pushing height into surrounding residential streets.

What Happens Next

Although the zoning amendment and rental housing demolition application have been recommended for approval, additional steps remain.

Before construction can proceed:

  • Final Site Plan approval must be secured
  • Conditions tied to servicing, tree replacement, and transportation must be satisfied
  • Required agreements will be registered on title to secure rental replacement and affordability commitments

For nearby residents, the takeaway is that this is a low-rise, policy-compliant project with long-term rental housing baked into its approval and not another speculative high-density redevelopment.

This application also offers a clear window into how future Lawrence Avenue West projects are likely to be evaluated: modest height, strong transitions, and rental protection as non-negotiables.

What Happens Next

The proposal is currently part of the City’s planning review process. That means:

  • City staff will assess the application against planning policy
  • Community consultation may occur as part of the review
  • Revisions can be requested before any approvals are granted

At this stage, the project is proposed, not approved. The final outcome will depend on planning feedback, potential adjustments, and City Council decisions.

For residents and buyers watching Lawrence Avenue West, this application is best viewed as part of a broader, long‑term shift toward mid‑rise housing along Toronto’s main corridors, rather than an isolated redevelopment.